NAUTICAL ACCESS OF THE CREW TRANSPORT VESSELS AT THE FIRST ARTIFICIAL ENERGY ISLAND
Taking into account the harsh meteorological conditions of the area, the port layout of the Island required to be evaluated to verify the nautical accessibility of the design vessels in terms of the required navigation area and the operational limits while maintaining the safety of the operations.