Studies focused on evaluating the nautical feasibility of access and berthing of a New Panamax container vessel at Dock C of the Port of Montevideo, with the aim of determining the viability of operations, as well as their operational limits and requirements for areas and tugboats. This work enabled the milestone of the first vessel of this kind to operate at the Port of Montevideo to be achieved.