FLOATING CAISSONS

Analysis and optimisation of the anchoring process for concrete caissons at the dock at the Port of Gijón, a work with a uniquely sized vertical structure on the Cantabrian coast. The study enabled the limits of the anchoring operation to be fixed (direction-height-wave times) over and above the technical literature for use, for the specific…

FIRST FSRU INSTALLATION IN THE WORLD

Nautical feasibility studies were carried out for the installation of the first commercial FSRU in the world, in the port of Bahía Blanca (Argentina). Subsequently, supplementary studies were carried out for progressive adaptation of the infrastructure to larger capacity vessels, from 138,000 m3 to 151,000 m3, raising the supply vessels up to Q-Flex class (216,000…

LNG BUNKER

Studies for putting LNG Bunker systems in place (Ferrol, Barcelona, Huelva and various European ports) to supply vessels in port, including recommendations for operation and safety procedures. SiBunker Project (Conceptual simulator for LNG bunkering operations, with indicators of availability for making decisions about the most suitable configuration and potential improvements to it) with AEI Gasnam,…